Industrial – warehousing buildings (rape pressing facility)

Cusomer: CJSC "Vikoil"
Completed operationsi: basic design;
Completed operations characteristics: total area – 531 m2;
Completion dte: 2006.

Gas cylinder filling station in the division of ammonia water

Cusromer: JSC “Achema”;
Completed operations: basic design;
Completed operations characteristics: completed operations characteristics - pipeline length – 331 m, pressure – 400 bar;
Completion date: 2006.

Expansion of carbamide formaldehyde

Customer: JSC “Achema”;
Completed operations: basic and detail design;
Completed operations characteristics: expanded production of carbamide formaldehyde resins 75.000 t/year;
Completion date: 2006.

Manufactory of natium, phosphorus, kalium (NPK) manures

Customer: JSC “Achema”;
Completed operations: basic design;
Completed operations characteristics: main buildings: NPK manures granulation buildings – 11.824 m2, production depot - 8.822 m2, raw depot – 3.365 m, railway – 2.748 m;
Completion date: 2007.

Dolomite mill

Customer: JSC “Achema”;
Completed operations: basic and detail design;
Completed operations characteristics: milling capacity – 130.000 t of dolomite crush rock per year, dolomite mill area - 1.123 m2, height - 27,82 m;
Completion date: 2007.

Liquid CO2 evaporator

Customer: JSC “Achema”;
Completed operations: basic design;
Completed operations characteristics: productivity of evaporator – 500 kg/h., pressure – 40 bar;
Completion date: 2007.

Station of gas compressors

Customer: CJSC “Ardynas”;
Completed operations: basic design;
Completed operations characteristics: four turbo-compressors, maximum productivity of station – 1.150.000 nm3 natural gas/h;
Completed project operations: process – management and automation, electronics connections, preventive and fire alarms;
Completion date: 2008.

Warehouse for paper and general cargo

Customer: JSC "Klaipeda Stevedoring Company";
Completed operations: basic design, detail design;
Completed operations characteristics: warehouse area – 4.000 m2, volume of loaded cargo 497.000 t/year;
Completion date: 2007.

Logistical warehouses with administrative premises

Customer: CJSC "Anetas",VsI "Duginsta";
Completed operations: basic design;
Completed operations characteristics rooms area: storage – 24.000 m2, administration – 600 m2, reconstruction of National crossroad;
Completion date: 2007.

Reconstruction of garage part with adjustment for technical gas storage

Customer: JSC "Achema" subsidiary company "Gaschema" ;
Completed operations: basic design;
Completed operations characteristics: reconstructed depot (with administrative premises) area – 341 m2;
Completion date: 2007.

Container of liquid CO2, in CJSC “Svyturys – Utenos alus” territory

Customer: JSC "Achema" subsidiary company "Gaschema";
Completed operations: basic and detail design;
Completed operations characteristics: container of CO2 - 28.000 l, pressure – 40 bar, telemetric mechanism;
Completion date: 2007.

Container of liquid CO2, in SIA “Aldaris” territory

Customer: JSC "Achema" subsidiary company "Gaschema";
Completed operations: basic design;
Completed operations characteristics: two container of CO2 by 28.000 l, pressure – 40 bar, telemetric mechanism;
Completion date: 2007.

Depot of gas

Customer: JSC "Achema" subsidiary company "Gaschema";
Completed operations: basic design, detail design;
Completed operations characteristicss: storage building area 540 m2, inflammable gas depot area - 74 m2;
Completion date: 2007.

Terminal of liquid substances

Customer: CJSC “Klaip?dos j?r? krovini? kompanija”;
Completed operations: basic and detail design;
Completed operations characteristics: total storage container: for inflammable material – 52.000 t, for nonflammable material – 13.000 t, two railway with stowage trestle-work for 22 carriages, product feeding to the embankment for liquids transfusion into ship;
Completion date: 2008.

Repository for 1.000 t of urea

Customer: JSC “Achema”;
Completed operations: basic and detail design;
Completed operations characteristics: repository type - ensilage, total area: 1.240 m2, capacity of batcher: 380 t, circulation of urea: 1000 t/day, length of railway: 504 m, circulation of cargo during railway: 365.000 t/year;
Completion date: 2008.